Ready-Mixed Concrete, Utah and Idaho: Populous to Terminal Power Pole Install

July 18, 2011


Owner: Pacificorp

General Contractor: Kewitt Construction

Completion Date: Summer 2010

Location: Downey, Idaho to Salt Lake City, Utah

Project Description:

This 115-mile project supplied 345,000 KV of AC power transmission from Downey, Idaho to Salt Lake City, Utah. JBP was selected to supply ready-mix ed concrete for the project because the company could be a single supplier for the project.

  • 945 pole foundations poured
  • Over 100 JBP concrete trucks involved
  • 123,567 cubic yards of concrete placed to-date at rate of 4.7 cubic yards per hour (one of the fastest large-scale pours ever completed)