Ready-Mixed Concrete, Utah and Idaho: Populous to Terminal Power Pole Install
July 18, 2011
Owner: Pacificorp
General Contractor: Kewitt Construction
Completion Date: Summer 2010
Location: Downey, Idaho to Salt Lake City, Utah
Project Description:
This 115-mile project supplied 345,000 KV of AC power transmission from Downey, Idaho to Salt Lake City, Utah. JBP was selected to supply ready-mix ed concrete for the project because the company could be a single supplier for the project.
- 945 pole foundations poured
- Over 100 JBP concrete trucks involved
- 123,567 cubic yards of concrete placed to-date at rate of 4.7 cubic yards per hour (one of the fastest large-scale pours ever completed)