City Creek Relocation
Company
Reynolds Excavation
Location
South Wasatch Front
Project Name: City Creek Relocation
General Contractor: Stacy Witbeck/Kiewit Western
Completion Date: 2011
Materials Used and Quantities:
- Storm Drainage Pipe 84” RCP- 1,500 LF (self-performed)
Demolition of the existing City Creek pipe and Installation of 1500 LF of 84” RCP in the same location for the Airport TRAX line. Including working at the Jordan River, damming the existing City Creek discharge, and holding back the river from coming into our excavation. Bypass pumping the City Creek drainage at an estimated 2,500 to 3,000 gallons per minute. High groundwater dewatering and flow bypassing with redundant pumps extended for the length of the installation, about six weeks.