Red Ledges Development

Company

Reynolds Excavation

Project Type

Construction

Location

South Wasatch Front

Owner Red Ledges Land Development
General Contractor:  Reynolds Excavation
Start Date:  2011
Completion Date:  2015

Materials Used and Quantities:

  • Sewer Line 6”-10”: 24,500 LF (self-performed)
  • Storm Drainage Pipe 12” – 24”: 14,000 LF (self-performed)
  • Waterline 8” – 24”: 33400 LF (self-performed)
  • Aggregates: 85,000 Tons
  • Asphalt Paving: 10,000 Tons
  • Mass Grading: 120,000 Cubic Yards
  • Pressure Reducing Vaults- 5
  • Water Booster Pump Station

Construction of new roads and infrastructure at Red Ledges in Heber City, UT. Large quantities of pipe were installed along with mass grading and paving on steep mountain terrain. Several pressure-reducing vaults were installed along with a large pump station. All work was self-performed for the project.