US 40; Gusher East Bound Passing Lane & Center Turn Lane April 15, 2021

Burdick Materials added the center turn lane to improve safety through the town of Gusher

Duchesne Valley Water Treatment Plant April 13, 2021

Burdick Materials was a subcontractor on this project for all of the civil earthwork, piping from 3” to 24” pipe in size, structural excavation, up to 26 feet deep, and HMA paving.

Roosevelt Municipal Airport January 18, 2021

Crews placed just over 20,000 tons of asphalt and just under 35,000 LF of pipe. The airport also received a full electrical and lighting upgrade.

C4 Mega Frack Pond

This project was the second pond Burdick Materials has built for EP Energy that is 20 acres in size designed to hold 1.2 million oil barrels of water which equal 50.4 million gallons of fresh water.