This project started at MP 357 to MP 363 and included a ½ mile of road reconstruction and widening for safety improvement, lane leveling, and six miles of 2” milling and overlaid with 2” of ½” SMA.
Company: Burdick Materials
Burdick Materials added the center turn lane to improve safety through the town of Gusher
Burdick Materials was a subcontractor on this project for all of the civil earthwork, piping from 3” to 24” pipe in size, structural excavation, up to 26 feet deep, and HMA paving.
Crews placed just over 20,000 tons of asphalt and just under 35,000 LF of pipe. The airport also received a full electrical and lighting upgrade.
This project was the second pond Burdick Materials has built for EP Energy that is 20 acres in size designed to hold 1.2 million oil barrels of water which equal 50.4 million gallons of fresh water.