Site Work, Excavation, Ready-Mixed Concrete, Utah: ADOBE SYSTEMS CAMPUS

June 15, 2012


Owner: Adobe Systems, Inc.
General Contractor: Okland Construction
Completion Date: 2012
Location: Lehi, Utah

This 230,000-square-foot building sits on 38 acres just off I-15. The new building is projected to bring at least 1,000 jobs to the area.

Reynolds Excavation, Demolition & Utilities provided the site work and excavation as well as aggregates for the building. Staker Parson Companies was also involved with the project as the ready-mixed concrete and asphalt supplier.

  • 22,000 tons backfill
  • 6,100 tons asphalt
  • 23,000 cubic yards ready-mixed concrete