Our Projects
Since 1952, Staker Parson Materials & Construction, A CRH Company, has safely built The Preferred Source of quality sand, rock, landscape products, ready-mixed concrete, asphalt, paving and construction services. We offer our customers the broadest range of quality products and services across the widest geography of any supplier in the Intermountain Region. We strive for excellence through our safe employees, world-class teams, breadth of innovative products and services, and commitment to sustainability.
I-15 SR-20 South Beaver Project
Western Rock Products recently completed the I-15, SR 20 to South Beaver, UT project! Work activities included placing over 71,000 tons of SMA asphalt on over 55 miles of roadway surface. This included resurfacing a northbound and southbound climbing lane. This project began in the Spring of 2023 and was completed in October 2023.
Fish Lake Doctor Creek Campground Project
Hales Sand and Gravel recently completed a reconstruction project on the Doctor Creek Campground in Fish Lake, UT. This project is an encampment located beside the beautiful Fish Lake and stands at an elevation of close to 9,000 feet. Work activities both began and were completed in September.
West Davis Corridor
The West Davis Corridor will be a new 16-mile, 4-lane divided highway in Western Davis County between the I-15 and Legacy Parkway junction at Glovers Lane in Farmington. It will help provide additional transportation options, reduce traffic impacts, and provide connectivity throughout the region. This highway will also include freeway-style interchanges, over 10 miles of new trails and connections, and a future extension of S.R. 193 in West Point.
Grantsville I-80 MP 50-60 Project
Staker Parson recently completed a rehabilitation project on I-80, from milepost 50 to 60, in Grantsville, UT. This project required 43 days for crews to remove the existing asphalt and place 47,000 tons of new SMA on the roadway surface. New lane striping and rumble strips were incorporated to enhance safety for travelers. Parking lot improvements were also made to two truck rest stops.
Lincoln County Airport Project
Hales Sand and Gravel recently completed work on an exciting project at the Lincoln County airport in Panaca City, Lincoln County, Nevada. Work activities for this project primarily included overlaying the Panaca Airport with 2 inches of FAA ½” asphalt. Hales Sand & Gravel bid on the project earlier this year to construct the runway using asphalt from Western Rocks’ Cedar City Hot Plant. Work on this project began near the end of August and, despite unique challenges faced, was successfully completed in September.
Richfield 500 North Project
The Hales Sand and Gravel team has been working expeditiously on an exciting project on the North 500 East Road in Richfield, Utah. This holistic reconstruction project spans three city blocks and focuses primarily on renovating the deteriorating state of the existing roadway and utilities.
Weber State University Stewart Stadium East Seating Replacement Project
In May, the Jack B Parson Ready Mix Concrete team began an exciting new project on Stewart Stadium at Weber State University in Ogden, Utah. This phase of the four-year project focuses on revamping the seating on the east side of the stadium by replacing and upgrading the east side bleachers to address sinking ground problems in the area and add stability to the structure for earthquake prevention. Jack B Parson provided 5,000 cubic yards of fiber-reinforced concrete for the project.
SR-24 Asphalt Rehabilitation & Shoulders Project
Nielson Construction & Materials completed a 32.5-mile-long improvement project on the scenic SR-24, the route designated as a National Scenic Byway and the primary access to Capitol Reef National Park. All improvements focused on increasing the safety score of the roadway. These improvements included widening and paving shoulders, extending drainage culverts, and flattening steep slopes to ensure safer passage.
US-6; MP 123 To Utah County Line
Staker Parson Materials & Construction completed a 40-mile-long preservation project on US-6 earlier this year. Improvements included 20 miles of highway rotomilling, placing HMA overlay and chip seal, and providing new pavement markings.
Taylor Mountain Road
Burdick Materials recently completed the Taylor Mountain project, located in northeastern Utah, approximately 6 miles north of Vernal. This 7-mile rural corridor is heavily traveled and provides connectivity and access to local businesses, private residents, and the Ashley National Forest. Due to its condition, updates and improvements were required to extend the life of the roadway.
Vineyard 6MG Water Tank
On September 21, 20222, Jack B. Parson performed night work, pouring 870 cubic yards of concrete and establishing the floor of the new Vineyard City 6MG Water Tank project. Crews were able to average 120 cubic yards per hour with two pumps.
Bitter Springs to Fredonia Highway (US 89A)
Western Rock Products is working on the Bitter Springs to Fredonia Highway (US 89A) Project located in Coconino County in North-Central Arizona. Valued at $8.1M, this 15-mile highway rehabilitation project will provide safer mobility for those traveling through the area by incorporating an intermittent climbing lane and updating the roadway surface.
View All