Our Projects

Since 1952, Staker Parson Materials & Construction, A CRH Company, has safely built The Preferred Source of quality sand, rock, landscape products, ready-mixed concrete, asphalt, paving and construction services. We offer our customers the broadest range of quality products and services across the widest geography of any supplier in the Intermountain Region. We strive for excellence through our safe employees, world-class teams, breadth of innovative products and services, and commitment to sustainability.

product thumbnail

Richfield 500 North Project

The Hales Sand and Gravel team has been working expeditiously on an exciting project on the North 500 East Road in Richfield, Utah. This holistic reconstruction project spans three city blocks and focuses primarily on renovating the deteriorating state of the existing roadway and utilities.

Learn More
product thumbnail

Weber State University Stewart Stadium East Seating Replacement Project

In May, the Jack B Parson Ready Mix Concrete team began an exciting new project on Stewart Stadium at Weber State University in Ogden, Utah. This phase of the four-year project focuses on revamping the seating on the east side of the stadium by replacing and upgrading the east side bleachers to address sinking ground problems in the area and add stability to the structure for earthquake prevention. Jack B Parson provided 5,000 cubic yards of fiber-reinforced concrete for the project.

Learn More
product thumbnail

US-6; MP 123 To Utah County Line

Staker Parson Materials & Construction completed a 40-mile-long preservation project on US-6 earlier this year. Improvements included 20 miles of highway rotomilling, placing HMA overlay and chip seal, and providing new pavement markings.

Learn More
product thumbnail

Taylor Mountain Road

Burdick Materials recently completed the Taylor Mountain project, located in northeastern Utah, approximately 6 miles north of Vernal. This 7-mile rural corridor is heavily traveled and provides connectivity and access to local businesses, private residents, and the Ashley National Forest. Due to its condition, updates and improvements were required to extend the life of the roadway.

Learn More
product thumbnail

Vineyard 6MG Water Tank

On September 21, 20222, Jack B. Parson performed night work, pouring 870 cubic yards of concrete and establishing the floor of the new Vineyard City 6MG Water Tank project. Crews were able to average 120 cubic yards per hour with two pumps.

Learn More
product thumbnail

Bitter Springs to Fredonia Highway (US 89A)

Western Rock Products is working on the Bitter Springs to Fredonia Highway (US 89A) Project located in Coconino County in North-Central Arizona. Valued at $8.1M, this 15-mile highway rehabilitation project will provide safer mobility for those traveling through the area by incorporating an intermittent climbing lane and updating the roadway surface.

Learn More
product thumbnail

SH-44, INT SH-16 to Linder Road

Idaho Materials & Construction completed the SH-44, INT SH-16 to Linder Road project in Treasure Valley, Idaho. Improvements to the 2.3-mile section of the highway were needed as this area is heavily traveled, seeing up to 23,000 cars daily, according to the Idaho Transportation Department. The existing roadway could only accommodate one travel lane in each direction, causing heavy congestion. This project minimized congestion by incorporating two travel lanes in each direction, providing better mobility for those traveling through the area. 

Learn More
product thumbnail

West Davis Corridor

The West Davis Corridor will be a new 16-mile, 4-lane divided highway in western Davis County between the I-15 and Legacy Parkway junction at Glovers Lane in Farmington and provide additional transportation options, reduce traffic impacts, and provide connectivity throughout the region. This highway will include freeway-style interchanges, over 10 miles of new trails and connections, and a future extension of S.R. 193 in West Point. Construction is anticipated through the fall of 2024. 

Learn More
product thumbnail

Utah State Correctional Facility

Earlier this year, Reynolds Excavation, Demolition, and Utilities completed work on the new Utah State Correctional Facility. Located in a remote wetland area west of Salt Lake City, this new 1.25 million square foot facility is the largest detention complex in Utah, sitting on nearly 200 acres of land. It is designed to house up to 3,600 inmates of all four classifications ranging from maximum security to the general population, with separate facilities for men and women.

Learn More
product thumbnail

Ferron Elementary School

Nielson Construction & Materials crews have been working hard constructing the new elementary school in Ferron Utah. The Ferron Elementary School building consists of 10 standard classrooms, 2 kindergarten classrooms, 1 preschool classroom, a gymnasium, a media center, and a kitchen with a lunchroom. The exterior will include landscaping, grass playfields, and three separate fenced playground areas.

Learn More
product thumbnail

SR-24; Sand Ledges to Koosharem Turnoff

Hales Sand & Gravel recently completed the SR-24; Sand Ledge to Koosharem Turnoff Project in Central Utah. This 11-mile project, located in the beautiful Koosharem Valley and adjacent to Koosharem Reservoir, required updating the shoulders and widening the roadway to improve and provide safer mobility for travelers.

Learn More