Our Projects

Since 1952, Staker Parson Materials & Construction, A CRH Company, has safely built The Preferred Source of quality sand, rock, landscape products, ready-mixed concrete, asphalt, paving and construction services. We offer our customers the broadest range of quality products and services across the widest geography of any supplier in the Intermountain Region. We strive for excellence through our safe employees, world-class teams, breadth of innovative products and services, and commitment to sustainability.

product thumbnail

ITD – US20-26, Locust Grove to Eagle Rd

Work of adding additional westbound and eastbound lanes between MP 39.22 and 40.22, US 20/26, Chinden Blvd, Locust Grove to Eagle Road, traffic signal modifications at Locust Grove and Eagle Rd, as well as pedestrian and irrigation improvements through this portion of the corridor.

Learn More
product thumbnail

Darigold Sitework

Miscellaneous site work, including importing material for new building pad, underground piping that included a pump station, and approximately five hundred feet of sewer force main piping, various concrete curb & gutter areas, sidewalk, pedestrian ramps, asphalt paving for the main truck yard, and landscape repair.

Learn More
product thumbnail

Orchard Park (Offsite STARS Agreement)

1.5 mile widening of US 20/26 doubling the highway’s capacity from roughly Linder to just east of Meridian Road and significant upgrades to adjacent ACHD roadways and the addition of a new collector road running through the middle of the new Orchard Park complex.

Learn More
product thumbnail

I-84, Franklin Blvd. to Franklin Road 

The I-84, Franklin Blvd. to Franklin Road project highlights efficient business practices and construction methods as part of a project that not just meets the Idaho Transportation Department’s (ITD) mission of safety, efficiency, mobility, and economic opportunity but exceeds it.

Learn More
product thumbnail

Red Ledges Development

Large quantities of pipe were installed along with mass grading and paving on steep mountain terrain. Several pressure-reducing vaults were installed along with a large pump station.

Learn More
product thumbnail

Blue Phoenix – Williams International

This project was a fast-paced addition to replace a facility Williams International had in Mexico that burned down.

Learn More
product thumbnail

RC Willey

RC Willey is the largest furniture outlet store in the Western United States. Jack B. Parson Ready Mix Concrete and Staker Parson Materials & Construction were happy to work with this group on this awesome project.

Learn More
product thumbnail

Jordanelle Parkway

Jordanelle Parkway is a $17.8 million dollar 3.75-mile-long road winding along the northwesterly side of Jordanelle reservoir from US-40 to SR-248.

Learn More
product thumbnail

City Creek Relocation

Demolition of the existing City Creek pipe and Installation of 1500 LF of 84” RCP in the same location for the Airport TRAX line.

Learn More
product thumbnail

Huntsman Cancer Institute Phase V

The project required the rerouting of existing utilities and installed new sewer, storm drain, and water. Reynolds excavated the structural package. Staker Parson paved the temporary road and patching existing areas.

Learn More
product thumbnail

Peerless Port

The Peerless Port was a project built in Carbon County along both east and west-bound shoulders of Highway 6. This project is a new Port of Entry that will replace the old one located 5 miles north in the mouth of Price Canyon. The project was designed to increase safety for the traveling public on Highway 6.

Learn More
product thumbnail

Roy Jr. High School Addition

An addition to Roy Jr. High school all of the wall were done in Insulated concrete form blocks. This was the first Davis County School that has been built using the ICF block technology.

Learn More

View All